The mixture should apply within 30mins When install ,the ground temperature should higher than 5℃ or lower than 35℃ Be sure no rain or water after 4 hours installed for each layer. In case of rain or delay a few days, please polish the whole court firstly.
© Copyright Guangzhou JRace Athletic Facilities Co.,Ltd.AllRights Reserved | 站长统计
HQ : Room 2605-2607 R&F Yingkai, No.16 Huaxia Road, Tianhe District, Guangzhou,China,510623